- Home
- Stallion Power Air and Electrical Components
- Stallion Power Truck Electrical Coiled Cable ABS Duty - Long Leads
Stallion Power Truck Electrical Coiled Cable ABS Duty - Long Leads
- SKU:
- 241540CL
- UPC:
- Weight:
- 3.00 LBS
- Shipping:
- Calculated at Checkout
MSRP:
Now:
$77.20
Was:
— You save
Description
Truck Anti-Skid Brake Cable Assemblies with Long Leads - Choose Either 40" or 72" Leads
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D" contacts. The plugs are corrosion proof and are tougher than metal plugs. Temperature range is -70 F to +400 F. The Philaprene jacket construction provides a tight coil memory, maximum abrasion resistance and maximum reliability. Conductors performance 4/12, 2/10, & 1/8.
Application: to couple electrical power to tractor lighting between tractor and trailer.
Made in the USA!
Benefits & Features
- Stallion Power Electrical Coiled Cables Anatomy
- Sag Proof Memory
- Maximum Performance at -70F to +400F
- No Damage When Dragged or Tossed
- Not Effected By Road Salt or Chemicals
- Patented Socket Locking Grip Prevents Accidental Disconnect From a Pull Force of up to 420 lbs
- Resistant to Driver's Abuse
- No Wear and Tear to Sockets
- Sure Fitting "D" Contacts
- Chamfer Cable Guard
- 3 Years Warranty
Related Products

Stallion Power Truck Electrical Coiled Cable Standard Lite Duty
MSRP:
Now:
$59.05 - $79.85
Was:
Truck Cable Assemblies Standard Lite Duty
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with tight fitting...

Combo or Single 40 in. Lead Stallion Power Air Lines - Coiled Air Brake Component
MSRP:
Now:
$53.10 - $94.47
Was:
--- This is for the Combo or Single Coiled Air Lines With 40 in. Leads---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the...

Alaskan Stallion™ Combo or Single 40 in. Lead Stallion Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$60.57 - $104.12
Was:
--- THIS IS FOR THE COMBO OR INDIVIDUAL RED/BLUE OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN...

Stallion Power Truck Electrical Coiled Cable ABS Duty
MSRP:
Now:
$88.36 - $95.56
Was:
Truck Anti-Skid Brake Cable Assemblies
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D"...

Stallion Set ABS 7 Way Cable & Air Lines with 40" Lead
MSRP:
Now:
$173.09
Was:
Stallion Set Red & Blue 15’ working length with 40” lead Air Lines combined with 15’ working length with 40” lead ABS 7 Way Cable.
• NO POGO STICK NEEDED•...
Customers Also Viewed

Stallion Power Truck Electrical Coiled Cable ABS Duty
MSRP:
Now:
$88.36 - $95.56
Was:
Truck Anti-Skid Brake Cable Assemblies
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D"...

Alaskan Stallion™ Combo or Single 40 in. Lead Stallion Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$60.57 - $104.12
Was:
--- THIS IS FOR THE COMBO OR INDIVIDUAL RED/BLUE OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN...

Alaskan Stallion™ Combo Red/Blue Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$94.57 - $101.94
Was:
--- THIS IS FOR THE COMBO RED/BLUE SET OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™.....

Alaskan Stallion™ Red Power Air Lines Coiled Air Brake Component
MSRP:
Now:
$48.51 - $62.00
Was:
--- THIS IS FOR THE INDIVIDUAL RED ALASKAN STALLION™ AIR LINE ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™... The Only...

Alaskan Stallion™ Blue Power Air Lines Coiled Air Brake Component
MSRP:
Now:
$48.51 - $62.71
Was:
--- THIS IS FOR THE INDIVIDUAL BLUE ALASKAN STALLION™ AIR LINE ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™... The Only...

Combo Red/Blue Stallion Power Air Line - Coiled Air Brake Component
MSRP:
Now:
$84.36 - $92.40
Was:
--- This is For The Combo Red/Blue Coiled Air Lines ---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the industry...THE ONLY AIR...

Combo or Single 40 in. Lead Stallion Power Air Lines - Coiled Air Brake Component
MSRP:
Now:
$53.10 - $94.47
Was:
--- This is for the Combo or Single Coiled Air Lines With 40 in. Leads---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the...

Stallion Power Truck Electrical Coiled Cable Standard Lite Duty
MSRP:
Now:
$59.05 - $79.85
Was:
Truck Cable Assemblies Standard Lite Duty
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with tight fitting...

Red Stallion Power Air Line - Coiled Air Brake Component
MSRP:
Now:
$41.64 - $55.13
Was:
--- This is For One Red Coiled Air Line ---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the industry...THE ONLY AIR LINES THAT...


Flexy® Coiled Extension Cord Extends 10 in. to 20 ft. - 16 Gauge - 13 Amps
MSRP:
Now:
$49.95
Was:
Made in the USA! Flexy® Extension Cord is the perfect and UNIQUE gift; not available or found anywhere else.Perfect Holiday Gift idea for the person or family on your list that has everything. A...